Interlock Defeat / Device Disable
Management System v1.5 (Driver)

Accelerator Complex:



Home
List of Defeats   ▸
List of Disables ▸
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation Removal

Interlock Defeat


Optics

M11 Septum TC #2 (TG304)
Implementation: Number:
2015-06-01 13:00:00 2015-2

Jas Uppal

Active
Estimated Duration:
104 weeks

Noisy signal is causing trips.

2

1) front of rack 1B M.H. mezzanine
2) MCR defeat board

Real TC disconnected at back of rack 1B, TC reference box, terminal #7. TC stub installed. Will read Meson Hall ambient temp.

Septum TC #1.





Jas Uppal: 2020-11-14 11:53:13.982014
paper defeat #7257
requested by Doug Preddy
implemented by Tony Tateyama
approved by Bob Scheepmaker