Interlock Defeat / Device Disable
Management System v1.5 (Driver)

Accelerator Complex:



Home
List of Defeats   ▸
List of Disables ▸
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation Removal

Interlock Defeat


Optics

1BVB2 Mag Temp interlock bypassed
Implementation: Number:
2018-10-16 10:15:00 2018-782

Jas Uppal

Active
Estimated Duration:
52 weeks

Temp interlock faulty

2

1) MCR defeat board
2) Front of power supply

TP4 grounded to TP9 at front panel of 1BVB2.

Water flow. Water flow verified by Doug Preddy on 2018-09-15.

11629




Jas Uppal: 2020-11-14 13:29:33.759863
paper defeat #8373
requested by Peter Yandon
implemented by Peter Yandon
approved by Peter Yandon