Implementation Removal

Interlock Defeat


Other / Misc

LESW spill #2 thermocouple (RF,321)
Implementation: Number:
2018-10-25 14:00:00 2018-783

Jas Uppal

Active
Estimated Duration:
52 weeks

Erratic temperature readings were causing cyclotron trips.

2

1) MCR defeat board
2) SAB2 rack 4-G

Thermocouple disconnected from patch panel and Utra stub attached to end at TC1 crate on SAB2 rack 4-G.

Other LESW spill TC's (#1 & #3). Temperature is tracking with beam.

11805

C2018-10-25-1



Jas Uppal: 2020-11-14 13:36:36.750108
paper defeat #8383
requested by ?
implemented by David Bandiera
approved by David Bandiera