Interlock Defeat /
Device Disable
Management System
v1.5
(Driver)
Accelerator Complex:
Driver
RIB
TR13
☰
Ops Apps Page
3DB
Webplan
Home
List of Defeats ▸
All
Active
Unacked
List of Disables ▸
All
Active
Unacked
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation
Removal
Interlock Defeat
System(s) Affected:
Safety
Interlock to be Defeated:
Gas Monitor #17
Implementation:
Number:
Date:
2019-11-13
Time:
10:30:00
2019-56
Implemented By:
Micheal Donohoe
In Consultation With:
Status:
Active
Estimated Duration:
104 weeks
Reason for Defeat:
Work has started for implementing Gas Monitor #17, an O2 deficiency monitor for TEM MOB149.
Number of Yellow Tags:
2
Location of Defeat Tag(s):
1) MCR Defeat Board
2) IBOP 1617
How Was Defeat Implemented?
Where is Defeat Located?:
IBOP I1617 pinned
Describe Alternate Protection:
N/A: O2 monitor not installed yet.
Fault Reports:
Work Permits:
Disables:
Interlock Defeat
Removal:
Number:
Date:
2023-07-10
Time:
08:45:00
2019-56
Removed by:
Micheal Donohoe
Status:
Active
Interlock Verification Method:
Number of Tags Removed:
0
Comments:
Micheal Donohoe:
2020-11-15 11:22:51.191415
Original paper defeat #8635
Requested/approved/implemented by Kevin Ardron
Kathleen Genge:
2023-07-10 08:42:02.045841
This monitor has never been undefeated since install back in 2019. It is associated with Work Request#5365, which at the time of writing, is still "released". No work permit can be found for this work.
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson