Interlock Defeat /
Device Disable
Management System
v1.5
(Driver)
Accelerator Complex:
Driver
RIB
TR13
☰
Ops Apps Page
3DB
Webplan
Home
List of Defeats ▸
All
Active
Unacked
List of Disables ▸
All
Active
Unacked
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation
Removal
Interlock Defeat
System(s) Affected:
Ion sources and injection BL
Interlock to be Defeated:
ISIS Skimmer-4 cable #61-0853
Implementation:
Number:
Date:
2020-04-20
Time:
00:30:00
2020-35
Implemented By:
Jas Uppal
In Consultation With:
Status:
Active
Estimated Duration:
104 weeks
Reason for Defeat:
Section alarming with no beam on it.
Number of Yellow Tags:
2
Location of Defeat Tag(s):
1) MCR defeat board
2) Cable in B.O.P.
How Was Defeat Implemented?
Where is Defeat Located?:
SK #4 (cable #61-0853) grounded at ISIS beamline B.O.P.
Describe Alternate Protection:
Other sections of Skimmer #4 still connected.
Fault Reports:
13151
Work Permits:
Disables:
Interlock Defeat
Removal:
Number:
Date:
Time:
2020-35
Removed by:
Status:
Active
Interlock Verification Method:
Number of Tags Removed:
0
Comments:
Jas Uppal:
2020-11-15 11:21:51.185818
Paper defeat #8733
Requested by Frank Hosta
Implemented by Frank Hosta
Approved by Frank Hosta
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson