Targets |
DarkLight target ladder |
Implementation: | Number: |
2022-08-08 10:30:00 | 2022-228 |
Brandon Humphries |
|
|
Active |
Est. Duration: 4 weeks |
Need to prevent target ladder from driving into beamline during high power tests. |
Next experimental run for DarkLight, or removal of target ladder from beamline. |
3 |
1-Cork board at back of DCR. 1-On lockout locally at target ladder. 1-On key in DCR lockout box. |
Controls cable to DarkLight target ladder motor was disconnected and placed in a lockbox. Clamp was attached to target slide rail to prevent it from moving in. |
Confirmed that the motor could not drive the targets in with the clamp in place. Then disconnected the motor control cable and confirmed the motor couldn't be powered. |
E-LINAC OPS #7 lock. |
n/a |
n/a |
|
Brandon Humphries: 2022-08-08 10:40:05.927451
Note that the DarkLight target ladder is located upstream of EHAT:IV0.