Implementation Removal

Device Disable


Optics

EMBD:MB0 P/S
Implementation: Number:
2022-11-09 11:45:00 2022-316

Brandon Humphries


Active
Est. Duration:
20 weeks

Cooling water has been shut off to EMBD:DUMP to prevent erosion of the target. Locking out this dipole will remove the possibility of sending beam down the EMBD. This is added protection on top of the beam mode interlock.

Water to EMBD:DUMP must be restored.

2

1- On cork board in back of DCR


1- On lockout box at EMBD:MB0 P/S (E-Hall roof racks -- MAC-EHR-024)

Power plug for EMBD:MB0 P/S was unplugged and locked out in a lock box (E-Hall roof racks -- MAC-EHR-024).

Tried to turn on P/S switch locally as well as through EPICS.

Lock "E5"

n/a

n/a



Brandon Humphries: 2022-11-09 11:45:01.010871
Extra tags added for going on the key in the E-Linac Lockout Box and on the front of the EMBD:MB0 P/S.
Eric Chapman: 2023-01-26 12:20:27.669977
Historically, best practice is to not completely stop water flow through devices during periods of non use as stagnant water becomes unconditioned which then accelerates corrosion. Best practice is to leave at minimum reduced flow through devices to maintain water chemistry and PH.