Optics |
EMBD:MB0 P/S |
Implementation: | Number: |
2023-05-12 07:45:00 | 2023-257 |
Brandon Humphries |
|
|
Active |
Est. Duration: 20 weeks |
E-LINAC commissioning license does not allow for sending beam to FLASH experiment at the end of EMBD. |
Updated license and approval from E-LINAC Head of Commissioning. |
4 |
1- On cork board in back of DCR 1- On lockout box at EMBD:MB0 P/S (E-Hall roof racks -- MAC-EHR-024) 1- On key in the key cabinet 1- On the front of the EMBD:MB0 P/S |
Power plug for EMBD:MB0 P/S was unplugged and locked out in a lock box (E-Hall roof racks -- MAC-EHR-024). |
Tried to turn on P/S switch locally as well as through EPICS. |
E-LINAC OPS #9 |
|
|
|
|