Interlock Defeat / Device Disable
Management System v1.5 (Driver)

Accelerator Complex:



Home
List of Defeats   ▸
List of Disables ▸
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation Removal

Interlock Defeat


Ion sources and injection BL

Skimmer #1 "B" side cable grounded
Implementation: Number:
2021-05-25 05:30:00 2021-169

Dale Nagra

Eric Chapman
Active
Estimated Duration:
4 weeks

Skimmer #1 trip at 5am. With beam and optics off in skimmer #1 section still in alarm.

2

1. MCR defeats board 2. ISIS skimmer BOP.

Cable 61-0818 disconnected and grounded.

Collimator protection and other skimmer sections. Many sections of skimmer bypassed, however the ISIS beamline is slated for replacement.