Estimated Duration:
52 weeks
|
EHDT:Q6 should not be used for the upcoming beam time to allow for using the last three BPMs up to EHD for beam position interlock. This device was already degaussed then locked out (2021-134), this defeat will allow for satisfying the MPS Optics OK summary (would usually fail if device wasn't on).
|