Optics |
EHAT:MB4 polarity switch locked out |
Implementation: | Number: |
2020-01-21 02:15:00 | 2020-48 |
Jason Wait |
|
|
Active |
Est. Duration: 104 weeks |
EHAT:MB4 polarity switch locked out until beam path to tunnel is ready |
beam path completion |
2 |
1) On lock box at device 2) On key in ELCR Lock box |
EHAT:MB4 polarity switch power cord unplugged and locked in a red lock box with a hasp provided by Doug P. Located at back of EHR-026. Locked with Lock # E-LINAC OPS #10 at back of E-Hall roof EHR-026 |
Device locked out until beam path completion |
Lock # E-LINAC OPS #10 |
|
|
|
Jason Wait: 2020-11-19 02:03:32.990374
Paper disable #121
Requested by Brandon H.
Implemented by Brandon H.
Approved by Brandon H.