Device Disable


Optics

EHAT:MB4 polarity switch locked out
Implementation: Number:
2020-01-21 02:15:00 2020-48

Jason Wait


Active
Est. Duration:
104 weeks

EHAT:MB4 polarity switch locked out until beam path to tunnel is ready

beam path completion

2

1) On lock box at device
2) On key in ELCR Lock box

EHAT:MB4 polarity switch power cord unplugged and locked in a red lock box with a hasp provided by Doug P. Located at back of EHR-026. Locked with Lock # E-LINAC OPS #10 at back of E-Hall roof EHR-026

Device locked out until beam path completion

Lock # E-LINAC OPS #10





Jason Wait: 2020-11-19 02:03:32.990374
Paper disable #121
Requested by Brandon H.
Implemented by Brandon H.
Approved by Brandon H.